Gallery & Case Studies 

Check out photos and case studies of projects we have helped realise and get in touch using the contact form below. 
Airtight Test

Case Studies 

MANCAVE/GARAGE 
JCV Ltd were commisioned to apply for Planning Permission & Building Control Application(LABC Partnership Agreement). All Pre-construction design, Engineering/Fire Detail (A1 Non-Combustible BS/EN Rescom Cellulose Magnesia Cement(CMC)Board) and Supply Chain Management. We took a Hybrid MMC approach to design with a HRS(Hot Rolled Steel) frame bolted to Passive Standard Re-enforced Raft(60% less concrete; 0.11 U-Value). We combined this with a SIP wall and Xtrafall(Warm Roof) and insulation between the joist(Cold Roof). MVHR System and Airsource Heat Pumps for underfloor heating as well as an internal fan for A/C. 
CHICHESTER 
Supply only of the SIP system to form the Superstructure. Once the installation of the SIP was done and the building was "watertight" the client finished of the project with their own trades. 
 
CLASSROOM 
One of 5 classrooms build for a group of schools in Suffolk over a period of 10 years. No wet trades required and use of 25 year warranty fire rated wall/ceiling and floor coverings allowed for time saving onsite. 1.6m groundscrews throughout with Heat Source Heatpump and 30 year warranty roof covering made from recycled tyres. Full commercial Building Regs with Part P handles and ramps throughout and emergency lighting. 
 
Hybrid Work POD 
Full Turnkey project using lightweight preassembled Light Guage Steel frame due to climb up to site and access for larger vehicles. Underfloor heating, smart lighting system and bathroom were installed. Click here for past Projects and Website 
Our site uses cookies. For more information, see our cookie policy. Accept cookies and close
Reject cookies Manage settings